The full spec and install sequence for setting interior doors on a new build — rough openings, reveals, hardware bores, and the order of operations that keeps a trim crew moving.
Category Archives: Uncategorized
Stain-Grade vs. Paint-Grade Trim — Spec It Right the First Time
What separates stain-grade from paint-grade trim, which material to order for each finish, and how to avoid a callback after the painter is gone.
Pre-Hung vs. Slab Doors — A Builder’s Decision Guide
When to spec pre-hung and when a slab is the right call — sizing, jamb widths, and the schedule math that keeps a build on track.